中文版 | English
 当前位置:首页  专职人员
刘英男
发布时间:2022-05-31



个人简介

  

刘英男,博士毕业于天津大学主要从事盾构隧道开挖面失稳演化机理及稳定性分析研究,在岩土工程三维可视化模拟、近接施工失稳破坏模型及多尺度数值模拟等方面取得了创新研究成果,目前已在岩土工程领域高水平期刊发表中英文学术论文10余篇


代表性学术论文

[1]. Liu, Y., Lei, H.,* Shi, L., Zheng, G., & Wang, M. (2024). Deformation analysis of ground and existing tunnel induced by overlapped curved shield tunneling. Journal of Rock Mechanics and Geotechnical Engineering. (Accept)

[2]. Lei, H.,*, Liu, Y., Zhang, Y., & Hu, Y. (2023). Ground deformation behaviour induced by overlapped shield tunnelling considering vibration loads of subway train in sand. Acta Geotechnica, 18(1): 519-533.

[3]. Lei, H.,*, Liu, Y., Hu, Y., Jia, R., & Zhang, Y. (2023) Active stability of the shield tunneling face crossing an adjacent existing tunnel: transparent clay model test and DEM simulation. Canadian Geotechnical Journal, 60(6): 864-884.

[4]. Lei, H., Zhai, S., Liu, Y.,*& Jia, R. (2022) Visualization analysis of the progressive failure mechanism of tunnel face in transparent clay. Geomechanics and Engineering, 29(2): 193-205.

[5]. 刘英男,雷华阳*,马长远,管波涵. 近接既有隧道盾构开挖面三维稳定性分析. 岩土工程学报, 2023, 45(7): 1374-1383.




Copyright @ 2008-2024 版权所有:同济大学隧道及地下工程研究所—五室

地址:上海市四平路1239号  邮编:200092